€40M
Land + Infrastructure
- Land area
- ~2.4 ha
- Total power
- 132 MW+
- Available now
- 12 MW
- Substation distance
- ~200 m
At a glance
-
12 MW
Now
Energised grid connection
-
40 MW
Short term
Substation under construction ~200 m away
-
80 MW
Around 2030
Private generation ~50 m away
A unique opportunity in the United Kingdom
Brownfield industrial site structured for the phased deployment of hyperscale, AI-ready data center infrastructure. It combines grid capacity available today, a short-term substation expansion and longer-term private generation: you can start now and grow beyond 100 MW without relocating or making a new grid application.
Key highlights
- 12 MW firm grid connection, energised and available immediately
- 40 MW substation under construction about 200 m away
- Up to 80 MW of private generation around 2030, about 50 m away
- Heavy-load piled foundations
- Existing B2/B8 industrial use, no change of use needed
- Offices, access, parking and security already in place
Power roadmap
- 12 MW firm, already energised and available immediately;
- 40 MW in the short term from a substation under construction about 200 m away;
- up to 80 MW of private generation around 2030, about 50 m from the site.
Power can be supplied from the grid, by private wire, or a blend of both.
Competitive advantages
Compared with a greenfield project, the site significantly reduces planning, political and delivery risk. The existing B2/B8 industrial classification means no change of use is needed: development is limited to design and construction works. The local authority supports the project, given the site's industrial and energy history.
Existing infrastructure
Heavy-load piled foundations are suitable for high-density multi-storey halls. The current warehouse can be replaced for a fast Phase 1; offices, access, parking and security are already in place. The site can expand onto adjacent land, up to 8 hectares.
Energy and ESG
A private electrical connection to a neighbouring solar farm allows part of the consumption to be offset with renewable energy, supporting power-blending strategies and ESG reporting.
Site details
Land
- Land area
- ~2.4 ha
- Site type
- Brownfield
- Can expand up to
- 8 ha
- Zoning
- B2/B8 (industrial)
- Foundations
- Heavy-load piled foundations
Power infrastructure
- Total power
- 132 MW
- minimum
- Available now
- 12 MW
- Substation distance
- ~200 m
- Power supply
- Grid, Private wire, Blended
Power delivery schedule
- Immediate
- 12 MWGrid · Firm, already energised connection
- Short term
- 40 MWGrid · Substation under construction ~200 m away
- Around 2030
- 80 MWPrivate generation · Private generation ~50 m from the site
Permits and approvals
- Change of use
- Not required
- Local authorities