Background pattern

Deploy your AI infrastructure in 6 months, not 4 years

Access a high-density modular campus ranging from 1 to 40 MW, with land and energy already secured. Scalable, sovereign, operational.

1 MW
per site
40+
interconnected containers
6 months
deployment
800 kW
net IT power per module

The race for AI is not waiting

Four obstacles are currently holding back your AI infrastructure projects

Critical delays

It takes 18 to 48 months to build a traditional data center. That's too long given the acceleration of AI models and global competition.

Thermal density

The latest generation of GPUs (H100, B200) require more than 40 kW per rack. Existing infrastructure is reaching capacity.

Service continuity

The cost of interrupting an AI model training session is enormous. Resilience must be native, not optional.

Access to energy

The shortage of land with secure power supply is blocking expansion projects across Europe.

The Modular Campus: an industrial approach

A turnkey solution based on pre-equipped containers that can be deployed on sites with already secured power supply.

Standard Format

Fully equipped, ready-to-use 40-foot high cube container

Plug & Play

Arrival pre-wired at site (electricity, cooling, security)

1 MW / Site

Total power per slot with 800 kW net IT

Secured lands

Land and electricity already available in France

Scalability

Add blocks according to your computing needs

Tier III+

Certified service level and availability

Native performance and resilience

Distributed architecture

A network of dozens of containers installed nearby (2 to 20 km away) forming a single virtual campus, interconnected by dark fiber.

  • Latence < 1ms Crucial for distributed computing and training across multiple sites
  • Unlimited bandwidth 100G, 400G, 800G based on your equipment
  • 100% sovereign network no data is transmitted over the public internet

AI hybrid cooling

Advanced thermal management for extreme densities. Up to 7 bays per module with free distribution of the available 800 kW IT.

Configuration examples:

  • 1 × rack 500 kW (DLC) + 3 × rack 100 kW
  • 7 × rack < 100 kW (Air or DLC)
  • 2 × rack 250 kW + 5 × rack 40 kW

= 800 kW IT Total per module

High availability

A/B redundancy

Double power supply to the racks

Independent UPS

Each container is battery-powered and self-contained.

STS Site

Seamless automatic source switching

Tier III+

Guaranteed contractual availability

Why this approach is a game changer

Time-to-market

  • First site operational in 6 months
  • Adding one site per week thereafter
  • Your models run 24 to 36 months ahead of the competition.

Sovereignty

  • 100% private and dedicated network
  • No data transits via the public internet
  • Infrastructure located in France

Guaranteed scalability

  • Pay-as-you-grow model
  • Reserve 2 MW today, guarantee 40 MW within 5 years
  • Transparent extension without service interruption

Ease of compliance

  • ICPE reporting regime (no prefectural authorization required)
  • Only a building permit is required.
  • Ready to use immediately after installation

Who is it for?

Infrastructure designed for the most demanding workloads

AI model training

Massively parallel clusters for training LLMs and foundation models.

Distributed inference

Edge deployment to reduce user latency and improve real-time experience.

HPC & Simulation

High-performance scientific computing on demand for research and industry.

A comprehensive service model

Delivery

Specialized transport and logistics managed from the factory to the concrete foundation.

Installation

Electrical connection, fiber optics.

Operation

24/7 monitoring, local support, and preventive maintenance included.

SLA Commitment

Recovery time guarantee (RTG) and contractual availability.

Accelerate your AI project

Find out how to access this unique infrastructure. Our experts will help you define the configuration that best suits your needs.