Deploy your AI infrastructure in 6 months, not 4 years
Access a high-density modular campus ranging from 1 to 40 MW, with land and energy already secured. Scalable, sovereign, operational.
The race for AI is not waiting
Four obstacles are currently holding back your AI infrastructure projects
Critical delays
It takes 18 to 48 months to build a traditional data center. That's too long given the acceleration of AI models and global competition.
Thermal density
The latest generation of GPUs (H100, B200) require more than 40 kW per rack. Existing infrastructure is reaching capacity.
Service continuity
The cost of interrupting an AI model training session is enormous. Resilience must be native, not optional.
Access to energy
The shortage of land with secure power supply is blocking expansion projects across Europe.
The Modular Campus: an industrial approach
A turnkey solution based on pre-equipped containers that can be deployed on sites with already secured power supply.
Standard Format
Fully equipped, ready-to-use 40-foot high cube container
Dark Fiber Interconnection
Plug & Play
Arrival pre-wired at site (electricity, cooling, security)
1 MW / Site
Total power per slot with 800 kW net IT
Secured lands
Land and electricity already available in France
Scalability
Add blocks according to your computing needs
Tier III+
Certified service level and availability
Native performance and resilience
Distributed architecture
A network of dozens of containers installed nearby (2 to 20 km away) forming a single virtual campus, interconnected by dark fiber.
- Latence < 1ms Crucial for distributed computing and training across multiple sites
- Unlimited bandwidth 100G, 400G, 800G based on your equipment
- 100% sovereign network no data is transmitted over the public internet
AI hybrid cooling
Advanced thermal management for extreme densities. Up to 7 bays per module with free distribution of the available 800 kW IT.
Configuration examples:
- 1 × rack 500 kW (DLC) + 3 × rack 100 kW
- 7 × rack < 100 kW (Air or DLC)
- 2 × rack 250 kW + 5 × rack 40 kW
= 800 kW IT Total per module
High availability
Double power supply to the racks
Each container is battery-powered and self-contained.
Seamless automatic source switching
Guaranteed contractual availability
Why this approach is a game changer
Time-to-market
- First site operational in 6 months
- Adding one site per week thereafter
- Your models run 24 to 36 months ahead of the competition.
Sovereignty
- 100% private and dedicated network
- No data transits via the public internet
- Infrastructure located in France
Guaranteed scalability
- Pay-as-you-grow model
- Reserve 2 MW today, guarantee 40 MW within 5 years
- Transparent extension without service interruption
Ease of compliance
- ICPE reporting regime (no prefectural authorization required)
- Only a building permit is required.
- Ready to use immediately after installation
Who is it for?
Infrastructure designed for the most demanding workloads
AI model training
Massively parallel clusters for training LLMs and foundation models.
Distributed inference
Edge deployment to reduce user latency and improve real-time experience.
HPC & Simulation
High-performance scientific computing on demand for research and industry.
A comprehensive service model
Delivery
Specialized transport and logistics managed from the factory to the concrete foundation.
Installation
Electrical connection, fiber optics.
Operation
24/7 monitoring, local support, and preventive maintenance included.
SLA Commitment
Recovery time guarantee (RTG) and contractual availability.
Accelerate your AI project
Find out how to access this unique infrastructure. Our experts will help you define the configuration that best suits your needs.