300 MW to build an AI data center
Industrial zone, South of France
Reference: VT-2026-8FoInJ Pre-approved by local authorities Posted on
Price
€66M
Land
+ RTE grid connection: €20M
- Land area
- ~22 ha
- Total power
- 300 MW
- Substation distance
- 150 m
- Power delivery lead time
- 48 months
At a glance
-
✓
Exploratory RTE study
Approved
-
✓
Land secured
-
✓
ICPE
Approved
A unique opportunity: 300 MW for an AI data center
Fully secured 22-hectare plot in the South of France, 150 m from the motorway. A major French group is marketing this de-risked site, ready for a next-generation data center.
Site highlights
- PTF signed for 300 MW, full connection within 4 years
- 60 MW by end of 2027, the rest by end of 2029
- ICPE approved, environmental permits obtained
- Four-season environmental study completed and approved
- Land secured, no acquisition risk
- Favourable zoning, no height limit
- Motorway 150 m away
Power
The PTF (RTE's connection offer) is signed for 300 MW, with full connection within 4 years: 60 MW available by the end of 2027, the rest by the end of 2029. The RTE substation is 150 m from the plot and the connection cost is estimated at €20M.
Why this site
With 300 MW guaranteed, the site meets the needs of the most ambitious AI projects. The administrative and technical steps have been handled upfront (ICPE, four-season environmental study, test fit, due diligence) so that construction can start quickly. Local zoning rules are favourable with no height limit, and the local authorities are committed to the project.
Documentation
The full marketing package and the test fit are available on request.
Site details
Land
- Land area
- ~22 ha
- Site type
- Greenfield
- Zoning
- Industrial zone
Power infrastructure
- Total power
- 300 MW
- Grid operator
- RTE
- Substation distance
- 150 m
- Estimated connection cost
- €20M
- Power delivery lead time
- 48 months
- Power supply
- Grid
Power delivery schedule
- December 2027
- 60 MWGrid
- December 2029
- 240 MWGrid
Permits and approvals
- Local pre-approval
- Approved
- RTE study
- Approved
- PTF (RTE connection offer)
- Signed
- ICPE (environmental permit)
- Approved
- Four-season environmental study
- Approved
- Test fit
- Approved
- Due diligence
- Approved
- Local zoning plan (PLU)
- Supportive
Access
- Motorway distance
- 150 m