22-hectare industrial land – 250 MW data center potential
Industrial zone, central France
Reference: VT-2025-001 Pre-approved by local authorities Posted on
Price
€18M
Land
+ RTE grid connection: €13M
- Land area
- 22 ha
- Total power
- 250 MW
- Substation distance
- < 5 km
- Power delivery lead time
- 60 months
At a glance
-
✓
Exploratory RTE study
Approved
-
✓
PTF
Approved
-
✓
Local pre-approval
Authorities on board
-
60
Months to delivery
After PTF
A strategic opportunity
220,460 m² (22-hectare) plot in an industrial zone in central France. The site offers rare potential for a 250 MW data center, including high-density AI workloads.
Key benefits
- Industrial zone pre-approved by local authorities
- Exploratory RTE study approved for 250 MW
- RTE substation less than 5 km away
- 2 hours from Lyon by car
- Undeveloped plot, ready for development
- Suited to a high-density AI data center
Grid connection
The exploratory RTE study has been approved for 250 MW. The substation is less than 5 km away; the connection cost is estimated at €13M, with power delivered within 60 months of the PTF (RTE's connection offer). No further power extension is planned.
Location
In the centre of the country, the site can serve the whole of France. Lyon is a 2-hour drive away, which keeps logistics and site operations simple.
Next steps
The building permit and the ICPE environmental application have not been filed yet.
Site details
Land
- Land area
- 22 ha
- Site type
- Greenfield
- Zoning
- Industrial zone
Power infrastructure
- Total power
- 250 MW
- Grid operator
- RTE
- Substation distance
- < 5 km
- Estimated connection cost
- €13M
- Power delivery lead time
- 60 months
- Power supply
- Grid
Permits and approvals
- Local pre-approval
- Approved
- RTE study
- Exploratory study approved
- PTF (RTE connection offer)
- Approved
- Building permit
- Not filed
- ICPE (environmental permit)
- Not filed
Access
- Lyon
- 2 h