Wanted: 5 MW AI-optimised data center
France – high-performance infrastructure
Reference: ADC-2025-001 Qualified buyer with confirmed budget
Maximum budget
€63M
Land + Infrastructure
Confirmed budget
- Required IT power
- 5 MW
- Minimum land
- 10,000 m²
- Minimum building
- 5,000 m²
- Maximum PUE
- ≤ 1.4
Critical requirements
-
✓
DLC cooling
Direct liquid cooling required
-
✓
Power redundancy
N+1 architecture minimum
-
✓
High density
Built for AI workloads
A strategic AI project
We are looking for a data center built to current AI standards, with cooling that can handle high thermal densities. The project is part of a wider rollout of infrastructure for compute-heavy artificial intelligence applications.
Key points
- Purchase or long-term lease considered
- Confirmed budget of €63M
- Purchase decision possible within 3 months
- Flexible on location within France
- Existing facility preferred, new build considered
Buyer profile
A fast-growing technology company specialising in artificial intelligence. It needs dedicated infrastructure for intensive compute and model training workloads.
Cooling
Direct liquid cooling (DLC) is essential to remove the heat from the GPUs and processors used for AI. Expected densities: 30 to 50 kW per rack.
Detailed requirements
Target property
- Transaction
- Acquisition / Long-term lease
- Property type
- Existing / New build
- Existing preferred
- Location
- France
- Flexible on location
- Minimum land
- 10,000 m²
- Minimum building
- 5,000 m²
Power infrastructure
- Required IT power
- 5 MW
- Redundancy
- N+1 minimum
- Power feed
- Dual feed
Cooling and efficiency
- Required cooling
- Direct Liquid Cooling (DLC)
- Maximum PUE
- ≤ 1.4
- Rack density
- 30 to 50 kW per rack
Requirements and timing
- Tier level
- Tier III minimum
- GDPR compliance
- Mandatory
- HQE certification
- Appreciated
- Decision timeframe
- < 3 months