Actively searching Tier III AI-optimised DLC required

Wanted: 5 MW AI-optimised data center

France – high-performance infrastructure

Reference: ADC-2025-001 Qualified buyer with confirmed budget

Maximum budget

€63M

Land + Infrastructure

Confirmed budget

Required IT power
5 MW
Minimum land
10,000 m²
Minimum building
5,000 m²
Maximum PUE
≤ 1.4

Critical requirements

  • ✓

    DLC cooling

    Direct liquid cooling required

  • ✓

    Power redundancy

    N+1 architecture minimum

  • ✓

    High density

    Built for AI workloads

Submit a data center

A strategic AI project

We are looking for a data center built to current AI standards, with cooling that can handle high thermal densities. The project is part of a wider rollout of infrastructure for compute-heavy artificial intelligence applications.

Key points

  • Purchase or long-term lease considered
  • Confirmed budget of €63M
  • Purchase decision possible within 3 months
  • Flexible on location within France
  • Existing facility preferred, new build considered

Buyer profile

A fast-growing technology company specialising in artificial intelligence. It needs dedicated infrastructure for intensive compute and model training workloads.

Cooling

Direct liquid cooling (DLC) is essential to remove the heat from the GPUs and processors used for AI. Expected densities: 30 to 50 kW per rack.

Detailed requirements

Target property

Transaction
Acquisition / Long-term lease
Property type
Existing / New build
Existing preferred
Location
France
Flexible on location
Minimum land
10,000 m²
Minimum building
5,000 m²

Power infrastructure

Required IT power
5 MW
Redundancy
N+1 minimum
Power feed
Dual feed

Cooling and efficiency

Required cooling
Direct Liquid Cooling (DLC)
Maximum PUE
≤ 1.4
Rack density
30 to 50 kW per rack

Requirements and timing

Tier level
Tier III minimum
GDPR compliance
Mandatory
HQE certification
Appreciated
Decision timeframe
< 3 months