Search for AI-Optimized 5MW Data Center
France - High-performance infrastructure
Maximum budget
63 M€
Infrastructure + Land
Puissance IT
5 MW
Minimum land area
10 000 m²
Minimum building size
5 000 m²
PUE max
1.4
Critical requirements
DLC cooling
Direct Liquid Cooling required
Power redundancy
N+1 architecture minimum
High density
Capable of handling AI loads
Strategic AI Project
We are looking for a data center that meets the new AI standards, with a cooling infrastructure capable of handling high thermal densities. This project is part of a strategy to deploy infrastructure for artificial intelligence applications requiring high computing power.
Key points of the project
- → Purchase or long-term lease possible
- → Confirmed budget of €63 million for the acquisition
- → Quick purchase decision possible (< 3 months)
- → Flexibility regarding location in France
- → Existing infrastructure preferred, but new construction possible
Buyer profile
Fast-growing technology company specializing in the development of artificial intelligence solutions. Identified need for a dedicated infrastructure to support our computational and model training workloads.
Detailed specifications
Real estate infrastructure
Minimum land area
10 000 m²
Minimum building area
5 000 m²
Localisation
France
Type
Existing or new
Electrical specifications
IT power requirements
5 MW
Redondance
Mandatory
Architecture
N+1 minimum
Power supply type
Dual feed
Cooling & Efficiency
Type requis
DLC
PUE maximum
1.4
Capacitu
High density
Important: Liquid cooling (DLC) is essential for managing the thermal loads of GPUs and processors used for AI. Expected densities: 30-50 kW per rack.
Certifications & Standards
You own a data center?
If your infrastructure meets our criteria, please contact us to present your offer.